Project Overview: This project is a big river treatment project which local government required because the water in the river is very dirty due to domestic sewage discharge. And our engineer design a total equipment according to the water quality, water volume, temperature
Place: A town in Chinese.
Water yield: 1500m³/d
Project period: 3 months
Design routing: